出版時間:2009-9 出版社:中國電力出版社 作者:中華人民共和國國家發(fā)展和改革委員會 頁數(shù):208 字數(shù):176000
內(nèi)容概要
本標準規(guī)定了水電水利工程現(xiàn)場金屬結(jié)構(gòu)制作、安裝及水輪發(fā)電機組和電氣設(shè)備的安裝的安全技術(shù)要求。 本標準適用于大中型水電水利工程現(xiàn)場金屬結(jié)構(gòu)制作、安裝和水輪發(fā)電機組及電氣設(shè)備安裝工程的安全技術(shù)管理、安全防護與安全施工。水型水電水利工程現(xiàn)場金屬結(jié)構(gòu)制作、安裝和水輪發(fā)電機組及電氣設(shè)備的安裝工程可參照執(zhí)行。
書籍目錄
Foreword1 Scope2 Normative References3 Terms4 General5 General Provisions6 Fabrication of Metal Structures7 Installation of Gates8 Installation of Headstock Gears9 Installation of Ship Lift10 Installation of Steel Pipes for Water Diversion11 Installation of Other Metal Structures12 Scaffold and Platform for Construction13 Metallic Painting for Anti-corrosion14 Installation of Hydraulic Turbine15 Installation of Generator16 Installation of Auxiliary Equipments17 Installation of Electric Equipments18 Startup and Commissioning of Hydroelectric Generating Unit19 Installation of Bridge Crane20 Construction Machines and Special Tools
章節(jié)摘錄
5. To operate the open-type automatic air breaker, knife switchand tubular fuse manually, insulating gloves, insulating bars and otherinsulating tools shall be used.6. To remove electric devices, the power supply shall be cut offfirst before exposed parts of conductive wires are well wrapped,insulated and marked.7. After installation of the power supply system for construction,a complete system of diagrams, layouts and distribution drawingsshall be available. The power supply system shall not be put into usewithout inspection and acceptance. Professional shift or team shallbe assigned to take charge of power operation and maintenance.Other staff shall not change the power supply facilities withoutpermission.8. The power supply facilities for construction on site shall bemaintained frequently and inspected once before the rain seasonevery year as well as measured for insulation resistance.9. To introduce power, monitor shall be provided.10. Safety appliances for electrician shall be comply withrequirements of relevant technical standards and checked regularly.11. The power supply lines shall be erected and laid, thetransformer substation for construction shall be designed for location,structure and distribution and the transformer, accessory eqm'pmentand electric lines shall be installed and maintained in compliance withrelevant regulations of DIdT 5370.12. Electric equipment and facilities of 127 V and above shall begrounded or zero terminated.
編輯推薦
《DL/T 5372-2007 水電水利工程金屬結(jié)構(gòu)與機電設(shè)備安裝安全技術(shù)規(guī)程(英文版)》由中國電力出版社出版。
圖書封面
評論、評分、閱讀與下載
DL/T 5372-2007 水電水利工程金屬結(jié)構(gòu)與機電設(shè)備安裝安全技術(shù)規(guī)程 PDF格式下載