DL/T 5372-2007 水電水利工程金屬結(jié)構(gòu)與機電設(shè)備安裝安全技術(shù)規(guī)程

出版時間:2009-9  出版社:中國電力出版社  作者:中華人民共和國國家發(fā)展和改革委員會  頁數(shù):208  字數(shù):176000  

內(nèi)容概要

  本標準規(guī)定了水電水利工程現(xiàn)場金屬結(jié)構(gòu)制作、安裝及水輪發(fā)電機組和電氣設(shè)備的安裝的安全技術(shù)要求。  本標準適用于大中型水電水利工程現(xiàn)場金屬結(jié)構(gòu)制作、安裝和水輪發(fā)電機組及電氣設(shè)備安裝工程的安全技術(shù)管理、安全防護與安全施工。水型水電水利工程現(xiàn)場金屬結(jié)構(gòu)制作、安裝和水輪發(fā)電機組及電氣設(shè)備的安裝工程可參照執(zhí)行。

書籍目錄

Foreword1  Scope2  Normative References3  Terms4  General5  General Provisions6  Fabrication of Metal Structures7  Installation of Gates8  Installation of Headstock Gears9  Installation of Ship Lift10  Installation of Steel Pipes for Water Diversion11  Installation of Other Metal Structures12  Scaffold and Platform for Construction13  Metallic Painting for Anti-corrosion14  Installation of Hydraulic Turbine15  Installation of Generator16  Installation of Auxiliary Equipments17  Installation of Electric Equipments18  Startup and Commissioning of Hydroelectric Generating Unit19  Installation of Bridge Crane20  Construction Machines and Special Tools

章節(jié)摘錄

5. To operate the open-type automatic air breaker, knife switchand tubular fuse manually, insulating gloves, insulating bars and otherinsulating tools shall be used.6. To remove electric devices, the power supply shall be cut offfirst before exposed parts of conductive wires are well wrapped,insulated and marked.7. After installation of the power supply system for construction,a complete system of diagrams, layouts and distribution drawingsshall be available. The power supply system shall not be put into usewithout inspection and acceptance. Professional shift or team shallbe assigned to take charge of power operation and maintenance.Other staff shall not change the power supply facilities withoutpermission.8. The power supply facilities for construction on site shall bemaintained frequently and inspected once before the rain seasonevery year as well as measured for insulation resistance.9. To introduce power, monitor shall be provided.10. Safety appliances for electrician shall be comply withrequirements of relevant technical standards and checked regularly.11. The power supply lines shall be erected and laid, thetransformer substation for construction shall be designed for location,structure and distribution and the transformer, accessory eqm'pmentand electric lines shall be installed and maintained in compliance withrelevant regulations of DIdT 5370.12. Electric equipment and facilities of 127 V and above shall begrounded or zero terminated.

編輯推薦

《DL/T 5372-2007 水電水利工程金屬結(jié)構(gòu)與機電設(shè)備安裝安全技術(shù)規(guī)程(英文版)》由中國電力出版社出版。

圖書封面

評論、評分、閱讀與下載


    DL/T 5372-2007 水電水利工程金屬結(jié)構(gòu)與機電設(shè)備安裝安全技術(shù)規(guī)程 PDF格式下載


用戶評論 (總計0條)

 
 

 

250萬本中文圖書簡介、評論、評分,PDF格式免費下載。 第一圖書網(wǎng) 手機版

京ICP備13047387號-7