自動化生產(chǎn)線安裝與調(diào)試

出版時間:2012-7  出版社:中國鐵道出版社  作者:呂景泉  頁數(shù):124  

內(nèi)容概要

  “Irtallation & Testing of Automatic Production Line”(Author:Lv Jingquan) corists of six parts.Chapter Zero is the project guidance,which mainly introduces guiding ideology and teaching design.Chapter One is the project start,which introduces national vocational skill competitior and typical Automatic Production Line(APL).Chapter Two is the project preparation,which compreherively explair knowledge points,technical points and skill points that APL requires.Chapter Three is the project acceptance,which mainly introduces irtallation and testing process of the five working statior with typical APL as a carrier.Chapter Four is the project decision,which mainly introduces equipment irtallation,gas circuit connection,electric circuit design and connection in typical APL.Chapter Five is the project challenging,which briefly introduces trend in development of APL and application of modem technology.The disk includes audio materials of Chapter Zero,Chapter One,Vocabulary and Teaching PPT as well.“Irtallation & Testing of Automatic Production Line” is available for a higher vocational education school curriculum textbook.It also can be used as the reference of the relevant engineer and techniciar.

作者簡介

  呂景泉,天津中德職業(yè)技術(shù)學(xué)院副院長,教授,獲得20多種職業(yè)資格和技術(shù)教育證書。曾在德國、新加坡、西班牙、加拿大、澳大利亞等20余個職業(yè)教育機(jī)構(gòu)、企業(yè)培訓(xùn)中心留學(xué)、進(jìn)修和調(diào)研。公開發(fā)表技術(shù)論文30余篇、職教研究論文30余篇,主編并出版機(jī)電類精品教材和國家“十五”、“十一五”規(guī)劃教材4部。主持國家級教育科研項目6項、國家級教學(xué)成果3項,組織完成14門國家級精品課建設(shè)工作。主持教育部、財政部支持區(qū)域性綜合實訓(xùn)基地建設(shè)項目(大模式)的建設(shè)工作。主持教育部重點課題《制造業(yè)技能型緊缺人才專業(yè)建設(shè)與實踐的研究》和教育部與聯(lián)合國教科文組織項目《制造業(yè)教師培訓(xùn)標(biāo)準(zhǔn)研究》。

書籍目錄

Project Guidance——Teaching DesignExplanation One Guiding IdeologyExplanation Two Teaching DesignProject Start——Brief Introduction to AutomaticProduction LineTask One Getting to Know APL and its ApplicationTask Two Getting to Know YL-335 APLBrief SummaryProject-Preparation——Application of APL CoreTechnologyTask One Application of Seror in the APLSubtask One Magnetic Switch and ItsApplicationSubtask Two Photoelectric Switch and ItsApplicationSubtask Three Brief Introduetion to Fiber OpticPhotoelectric Proximity Switch andIts ApplicationSubtask Four Brief Introduction to InductiveProximity Switch and ItsApplicationSubtask Five Brief Introduction to PhotoelectricEncoder and Its ApplicationTask Two Control of Asynchronous Motor in the APLSubtask One Use of the AC AsynchronousMotorSubtask Two Use of Univeral FrequencyConverter DriverTask Three Application of Servo Motor and Driver in the APLSubtask One Getting to Know AC Serve Motorand DriverSubtask Two Hardware Wiring of Servo Motorand DriverTask Four Application of Pneumatic Technology in the APLSubtask One Getting to Know Pneumatic PumpSubtask Two Getting to Know PneumaticActuating ComponentsSubtask Three Getting to Know Pneumatic ControlComponentsTask Five Application of PLC in the APLSubtask Getting to Know the Structure of S7-200PEGTask Six Application of Communicatior in the APLSubtask Getting to Know PPI CommunicatiorTask Seven Application of Human-Machine Interface andConfiguration in the APLSubtask One Getting to Know TPCT062K Humanmachine Interface and MCGSEmbedded Industrial ControlConfiguration SoftwareSubtask Two Wiring of TPCT062K and PLC andEngineering ConfigurationProject Acceptance——Irtallation and Testing ofUnits in the APLTask One Irtallation and Testing of the Feeding UnitSubtask Getting to Know the Feeding UnitTask Two Irtallation and Testing of the Processing UnitSubtask Getting to Know the Processing UnitTask Three Irtallation and Testing of the Assembly UnitSubtask Getting to Know the Assembly Unit,Task Four Irtallation and Testing of the Sorting UnitSubtask Getting to Know the Sorting UnitTask Five Irtallation and Testing of the Delivery UnitSubtask Getting to Know the Delivery UnitProject Decision——Irtallation and Testing for theAutomatic Production LineTask One Equipment Irtallation of YL-335B APLTask Two Gas Circuit Connection in YL-335B APLTask Three Electric Circuit Design and Connection in APETask Four Programming and Program TestTask Five Testing and Fault Analysis in the APLProject Challenging——Knowledge Development ofthe Automatic Production LineTask One PROFIBUS TechnologySubtask One Getting to Know PROFIBUSSubtask Two Getting to Know the BasicFunction of PROFIBUSTask Two Industrial Control ConfigurationSubtask One Getting to Know ConfigurationSubtask Two Getting to Know Properties ofMCGS Configuration SoftwareTask Three Industrial RobotsSubtask One Getting to Know IndustrialRobotsSubtask Two Getting to Know the Properties ofIndustrial RobotsTask Four Prospects for Flexible Production LineSubtask One What Is Flexible ProductionLine?Subtask Two Getting to Know Principle of FPLProcess Design

編輯推薦

  《中國教育部高職高專自動化技術(shù)類專業(yè)教學(xué)指導(dǎo)委員會規(guī)劃教材:自動化生產(chǎn)線安裝與調(diào)試(英文版)》立體化教材,以賽項為依托,采取任務(wù)驅(qū)動形式,完整地體現(xiàn)了賽項對學(xué)生技術(shù)技能、職業(yè)素質(zhì)、團(tuán)隊合作等方面的要求,實為學(xué)生日常實訓(xùn)、教師指導(dǎo)學(xué)生的重要參考。該書發(fā)行3年來,再版2次,發(fā)行量逾5萬冊,還被譯為英文版發(fā)行到東盟國家,對東盟技能大賽的賽項設(shè)計,產(chǎn)生了重要影響,同時,也是東盟國家學(xué)生201 2年來華參與中國全國職業(yè)院校技能大賽的基礎(chǔ)。

圖書封面

評論、評分、閱讀與下載


    自動化生產(chǎn)線安裝與調(diào)試 PDF格式下載


用戶評論 (總計0條)

 
 

 

250萬本中文圖書簡介、評論、評分,PDF格式免費(fèi)下載。 第一圖書網(wǎng) 手機(jī)版

京ICP備13047387號-7