出版時間:2002-10 出版社:(影印版) (2002年1月1日) 作者:賈洛特 頁數(shù):372 字?jǐn)?shù):590000
Tag標(biāo)簽:無
內(nèi)容概要
本書主要內(nèi)容有:軟件能力成熟度模型介紹,包括項(xiàng)目執(zhí)行中基于過程的方法、Infosys應(yīng)用概況;項(xiàng)目初始工作,包括建議和合同,需求說明和管理(需求分析和說明,需求變化管理,可追蹤性管理);項(xiàng)目計(jì)劃,包括過程定義和度量,過程數(shù)據(jù)庫與過程能力基線,工作量預(yù)估與時間調(diào)度,質(zhì)量計(jì)劃與缺陷評價,風(fēng)險(xiǎn)管理(風(fēng)險(xiǎn)評估,風(fēng)險(xiǎn)控制及實(shí)例),項(xiàng)目管理計(jì)劃,配置管理的概念、過程和實(shí)例;項(xiàng)目執(zhí)行與終止,包括生存周期中的詳細(xì)設(shè)計(jì)、構(gòu)建、系統(tǒng)測試、接受和安裝,數(shù)據(jù)采集與監(jiān)控,項(xiàng)目監(jiān)控與控制(數(shù)據(jù)采集,項(xiàng)目跟蹤,量化監(jiān)視和控制,缺陷分析和預(yù)防),項(xiàng)目核查(核查過程,核查分析),項(xiàng)目終結(jié)分析、歸檔,實(shí)例終結(jié)分析報(bào)告。
作者簡介
Pankaj Jalote is Professor and Chairman of the department of computer Science and Engineering at the Indian Institute of Technology,Kanpur.he was formerly Assistant Professor in the Department of computer Science at the University of maryland,College
書籍目錄
Praface Acknowledgments1 Introduction 1.1 Process-Based Approach for Project Execution 1.2 Capability Maturity Model for Software 1.3 Processes at Infosys 1.4 SummaryPart I PROJECT INITIATION 2 Proposals and Contracts 2.1 Customer and Vendor Interaction 2.2 The Proposal 2.3 The Contract 2.4 Summary 3 Requirements Specification and Management 3.1 Requirements Analysis and Specification 3.2 Requirements Change Management 3.3 Traceability Management 3.4 Example: The WAR System 3.5 SummaryPart II PROJECT PLANNING 4 Process Definition and Tailoring 4.1 Development Process 4.2 Process Tailoring 4.3 Summary 5 Process Database and Process Capability Baseline 5.1 Software Metrics and Process Management 5.2 Process Database 5.3 Process Capability Baseline 5.4 Summary 6 Effort Estimation and Scheduling 6.1 Background 6.2 Bottom-Up Estimation 6.3 Top-Down Estimation 6.4 Scheduling 6.5 Summary 7 Quality Planning and Defect Estimation 7.1 Quality Management 7.2 Quantitative Quality Management Planning 7.3 Summary 8 Risk Management 8.1 Background 8.2 Risk Assessment 8.3 Risk Control 8.4 Examples 8.5 Summary 9 Project Management Plan 9.1 Project Management Plan 9.2 Example: Project Plan of WAR 2.0 9.3 Summary 10 Configuration Management 10.1 Configuration Management Concepts 10.2 Configuration Management Process 10.3 Document Control 10.4 Example: Configuration Management Plan of the WAR Project 10.5 SummaryPart III PROJECT EXECUTION AND TERMINATION 11 Life Cycle Execution 11.1 High-Level Design 11.2 Detailed Design 11.3 Build 11.4 System Testing 11.5 Acceptance and Installation 11.6 Summary 12 Peer Review 12.1 Review Process 12.2 Data Collection 12.3 Monitoring and Control 12.4 Introduction of Reviews and the NAH Syndrome 12.5 Summary 13 Project Monitoring and Control 13.1 Data Collection 13.2 Project Tracking 13.3 Quantitative Monitoring and Control 13.4 Defect Analysis and Prevention 13.5 Summary 14 Project Audits 14.1 Audit Process 14.2 Audit Analysis 14.3 Summary 15 Project Closure 15.1 Project Closure Analysis 15.2 Archiving 15.3 Closure Analysis Report for WAR 2.0 15.4 SummaryAppendix A: From ISO 9000 to CMMAppendix B: Managing the Software Process Improvement Project Index
圖書封面
圖書標(biāo)簽Tags
無
評論、評分、閱讀與下載